Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks

Product Details
Customization: Available
Warranty: 5 Years
Condition: New
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Multi-language Pioneer
3 languages freely used by foreign trade staff. include: English, German, French
Patents Awarded
The supplier had awarded 5 patents, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO14001
ISO45001:2018 certificate
to see all verified strength labels (26)
  • Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
  • Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
  • Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
  • Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
  • Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
  • Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
Find Similar Products

Basic Info.

Model NO.
100-800m3
Screw
0
Treatment
Biological Treatment
Anticorrosive
Yes
Colour
Self Determined
Position
Outdoor
Transport Package
Container
Specification
100-800m3
Trademark
Fairyland
Origin
China
HS Code
7204210000
Production Capacity
1000 Per Year

Product Description

1.1 Technology introduction

The main function of the biogas slurry temporary storage system is to store the anaerobic digested biogas slurry. Can balance the fluctuation of the discharge volume of the front-end anaerobic fermentation tank and the processing volume of the back-end dehydration equipment. At the same time, it can serve as a secondary anaerobic digestion tank, which can continue to produce biogas and improve the overall economic benefits of the project.
The temporary storage system for biogas slurry generally adopts the form of a tank, equipped with a central stirring device. The stirring force can fully mix the substances deposited at the bottom, floating at the top, and suspended substances. So that a relatively homogenous sludge is produced for the dewatering process.
Install a liquid level gauge on the temporary storage tank of biogas slurry to monitor the parameters inside the tank in real-time, ensuring safe operation.
  • 1.2 Product Outstanding
     
  • Secondary anaerobic digestion tank without heating equipment, relying on waste heat to continue digestion, can generate 5-15% more biogas
  • Further degrade organic matter and reduce the pressure on subsequent sewage treatment facilities
  • Adopting a tank form to avoid the risk of leakage in the tank form and reduce operational safety hazards
  • Connect biogas to subsequent biogas treatment units to increase the total biogas production of the project
  • Install high and low pressure protection devices to effectively prevent the danger caused by high or low pressure and protect the safety of the tank.
  •                                     
  • 1.3 Process parameters (kitchen waste)
  • No. Indicator Unit Value
    1 Inputs t/d 100~1000t/d
    2 Slurry pH -- 7~9
    3 Content of solids % 2~5
    4 Eta_VS % 40~50
    5 Retention time d 1~2
    6 Operating conditions   continuos
    7 Operating time _ 365d,24h/d
  • 1.4 Fermentation liquid storage/secondary fermentation Tank
  • Storage of anaerobic digested biogas slurry; It can also serve as a post anaerobic digestion tank.
  • Like fermentation tanks, the materials and structural forms of biogas slurry tanks/post fermentation tanks currently mainly include Schumann tanks, Lipp tanks, enamel assembled tanks, and carbon steel welded anti-corrosion tanks.
    Type ZZ-120 ZZ-260 ZZ-380 ZZ-500 ZZ-710
    Diameter(m) 5.35 6.88 7.64 7.64 9.17
    Height(m) 6.49 8.42 9.65 11.9 12.33
    Volume of straight tube section(m3) 121 268 387 565 713
    Design pressure(KPa) 0-3.5
Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks
Storage Post Fermentation Schumann Lipp Enamel Assembled Tanks


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier